We rent out parking spaces for public electric vehicle charging stations on streets and in other public areas to companies providing electric vehicle charging services. The spaces available are on-street parking spaces or located in separate car parks.
Depending on their location, the spaces are suitable for either standard charging (AC) or fast or high-power charging (DC). The size of the charging stations varies. Each charging station has several parking spaces designated for charging.
The responsibilities of the tenant and the City
As the tenant, you will install, own and maintain the charging equipment and set the price for charging. The City of Helsinki is responsible for traffic signs and for maintaining and keeping the street area clean.
The rented spaces may only charge a charging fee, not a parking fee. Our Parking Control will monitor that the spaces are used for charging only.
We will provide advance notice of any work carried out in the area if it affects the use of the charging station.
Charging stations on a map
On the map, you can see the charging stations that are available, reserved or already in use. Click on a map marker and the location ID to view details of the charging station, such as the number of parking spaces associated with it and the ground rent price zone.
Key to map symbols
Green: available, the charging station can be reserved
Blue: available, the charging station is ready for an electricity connection
Yellow: reserved, but not yet rented out or constructed
Orange: rented out, but not yet constructed
Red: constructed, the charging station is ready
Black: temporarily out of service
There is no precise text list available of the map’s content.
How the process of renting charging stations progresses
-
Select charging stations from the map
Check the ID and price zone of the charging station. You can reserve up to 25 charging stations in a single call. Each charging station is allocated in its entirety to a single operator.
-
Fill in the application form
Enter the ID of the charging station on the form. Please fill in a separate form for each station. Please attach to your application a Trade Register extract that is no more than three months old. If the application is signed by an authorised representative, please also enclose a power of attorney. On the form, we also request your consent for a sanctions list check.
The application form will be published on this page on Tuesday 1 December 2026 at 12.00 EET.
You will receive an automatic confirmation from us once we have received the form.
-
You will receive a reservation confirmation from us
The City processes reservations on a first-come, first-served basis and allocates each charging station to the applicant whose reservation was received first. We will confirm your reservation, provided that the terms and conditions set out on this page are met. You will receive written notification when negotiations on the lease agreement can begin. We will also notify you if the charging station that you applied for is reserved for another service provider.
We mark the charging station on the map as provisionally reserved.
-
Conduct negotiations on the lease agreement with the City
Once negotiations on the lease agreement have been concluded, the City will issue a decision on the tenancy, and the agreement will be signed electronically. Rent payments will commence three months after the lease agreement comes into force.
Read more about how the rent is determined
Negotiations on the lease agreement may take up to six months from the date the reservation is confirmed. If the agreement is not signed within six months, the reservation will be cancelled. The City may also terminate the negotiations before then if no agreement can be reached, e.g. if, in the City’s assessment, the applicant is unable to fulfil the conditions set out in the lease agreement or placement agreement.
We enter into a ten-year land lease agreement.
During November, we will publish a land lease agreement template that you can use to familiarise yourself with the terms of the agreement.
-
Sign a placement agreement, provide security and order an electricity connection
In addition to the lease agreement, a separate placement agreement is required for each charging station.
Find out more about applying for a placement agreement
The tenant shall provide security by the time the placement agreement is signed, and in any event no later than six months after the lease agreement is signed.
Read more about the required security
The tenant orders an electricity connection from the local electricity distribution network operator, Helen Electricity Network.
-
Submit a notification of excavation work
Submit a notification of excavation work to the City via the Haitaton system for any work carried out on the streets. Excavation work is most likely to be successful between 15 May and 30 November. Please note the qualification requirements relating to the carrying out of excavation work.
Read more about submitting a notification of excavation work
-
Notify us when the excavation work is complete
Have the excavation work carried out within the agreed timeframe and notify us of its completion via the Haitaton system. All work must be finished no later than 12 months after the placement agreement comes into force.
The charging station will be ready for use once we have approved the notification that the excavation work has been completed and installed the necessary road signs.
Requirements for operators and charging stations
Your company can apply for spaces for charging stations if it
- is entered in the Trade Register or an equivalent foreign register
- is able to provide the necessary security
- is capable of constructing charging stations and managing their upkeep, operation and maintenance throughout the ten-year agreement period
- provides the charging station for public use and complies with the requirements set out in national and EU legislation.
Foreign companies may also apply for places, provided that they have a Finnish business ID. Compliance with these requirements does not oblige the City to enter into a lease agreement.
What are the requirements for charging stations?
Charging stations must comply with the Helsinki Design Manual. The Helsinki Design Manual sets out requirements relating to placement, appearance, safety and noise limits. The Helsinki Design Manual also specifies the appropriate charging types (AC or DC) for each station.
Please note that charging equipment must not display any advertisements. However, the operator’s logo can be displayed on the top of the charging equipment. Charging cables must not be left on the ground, so that the area can be kept clean.
Helsinki Design Manual instruction cards (in Finnish):
Requirements for electric vehicle charging stations(Link leads to external service)
Requirements for electrical cabinets(Link leads to external service)
Guidelines for crash barriers (bollards)(Link leads to external service)
How should paying for charging be arranged?
The payment options must be fair to everyone and comply with EU and Finnish legislation. We recommend that the charging unit include an integrated card payment terminal.
Rental rates and other costs
You pay rent to the City for each parking space associated with the charging station. The amount of the rent is determined by the price zone in which the charging station is located. The price is the same for both AC and DC charging stations.
Ground rent price zones on the Helsinki map service(Link leads to external service)
Ground rents (per space per month, VAT 0%)
- Price zone 1: EUR 104.17
- Price zone 2: EUR 75.00
- Price zone 3 and 4: EUR 58.33
- Price zone 5 and 6: EUR 33.33
Example: The charging station has four spaces and is located in price zone 1. The monthly rent is 4 × EUR 104.17 = EUR 416.68 + VAT.
The City charges rent on a per-parking-space basis, based on the price zones and rates set out in the market price survey carried out in December 2024. The rent is linked to the official cost-of-living index. The rent, as determined by the market rent survey, shall be adjusted in accordance with the cost-of-living index in force at the time when the agreement is signed.
We require a security from the tenant of EUR 5,000 per charging station. The security covers all obligations under the lease agreement and placement agreements. More detailed requirements regarding the security will be discussed during the lease agreement negotiations.
The tenant shall provide security by the time the placement agreement is signed, and in any event no later than six months after the lease agreement is signed. The security must remain valid for at least six months after the lease agreement ends. No interest is paid on the security.
- Placement agreements are subject to fees in accordance with the City’s price list: Prices for placing permanent cables, structures and equipment (in Finnish, PDF)
- Excavation work and construction sites are subject to fees in accordance with the City’s price list: Charges for work carried out on streets and in public areas
- Electricity connections are subject to fees in accordance with Helen Electricity Network’s price list: Helen Electricity Network’s price list(Link leads to external service)
Contact information
Please contact us by email at latausasemat@hel.fi(Link opens default mail program).