Suoraan sisältöön

M300

As rail traffic extends to the west, to the new track section from Ruoholahti to Matinkylä, new vehicles are needed for metro transport.

To meet the needs of the growing metro traffic, HKL has ordered 20 four-carriage metro trains from Spanish rail equipment manufacturer CAF. The first metro will be tested in 2015. The whole series will be delivered between 2015 and 2016.

The new metro trains are nearly 90 metres long and all the carriages have access to each other. There is space for around 600 passengers. The carriages have air conditioning.

The new metro trains are equipped with automated machinery, but initially they will be operated by a driver. For this, the metro trains have a temporary cabin, which will be disassembled when automated driving is introduced. 

Brochure on the M300 metro (in Finnish)
 

  

 

The technical specifications of M300 carriage pair

Type: electric motor train (operating voltage 750 V DC)
Manufacturer: Construcciones y Auxiliar de Ferrocarriles (CAF)
Years of manufacture: 2014–2016
Number: 20 metro trains with four carriages
Passengers: 576 in total, 228 seated
Maximum speed: 90 km/h
Weight: approx. 130 t
Length: 88.22 m
Width: 3.2 m
Height: 3.7 m
Engines: 12x230 kW
Bodywork: aluminium

SHARE